Key Takeaways: Electrosurgical Safety
By: Aorn Staff
Published: 12/3/2021
Share:
Publish Date: April 14, 2021
TAKEAWAY:
Determine a standardized communication strategy for when insulation failure is found during sterile processing.
EXPLANATION:
- Burns may be caused by insulation failure.
- (NEW) Inspect active electrodes for insulation failure before, during, and after a procedure. 3.5.
- (NEW) Use an active electrode insulation integrity tester while preparing active electrodes for packaging during processing. 3.5.1.
- If an insulation failure is identified during processing, sterile processing personnel should remove the damaged device from service. 3.5.2.
- (NEW) Create an interdisciplinary team that includes perioperative and sterile processing personnel to determine the standardized communication strategy. 3.6.
- (NEW) Include the following communication strategies and actions:
- the communication pathway between sterile processing and surgery personnel,
- physician notification,
- device handling, and
- documentation according to facility policy and procedure. 3.6.1.